Tasmania

Great Pyramid

The Great Pyramid deposit was discovered in 1909 and although the tenement has been the subject of several exploration campaigns over subsequent years, only very minor production has ever taken place.

In 2014, TNT announced a JORC (2012) compliant Inferred Mineral Resource estimate for Great Pyramid based on the 2011 Mineral Resource and the technical review and inclusion of completed “Table 1” information as required under the revised JORC code.

Significant exploration upside exists that could be unlocked with targeted drilling below the average depth of the current holes – 75% of the drilling is less than 45m deep and often ending in mineralisation.

Drilling indicates the deposit’s extent is not constrained laterally or vertically, with some signs that grade increases with depth.

Our projects